The subject is (has) been extensively remodeled. The parking areas are to be re-paved with asphalt parking, new stripping & will have approximately 90-95 spaces per the new site plan. Some of the interior walls are to be removed & replaced for an expansion in the sanctuary area. Portions of the building have been repainted, had with new carpet installed, stained and sealed concrete floors and tile in various areas throughout. The balcony was recently finished out and now opens to the sanctuary with a new clear laminated glass guardrail installed. The entire sanctuary area was remodeled with new paint on the walls and ceiling, new light fixtures, a remodeled stage area, & new audio visual equipment installed (Negotiable). The existing education building is also to be repainted with new flooring added and all roughly finished areas are to be finished out. Both buildings will have new roofs installed. All information stated is considered to be unreliable & need to be verified.
Users may not reproduce or redistribute the data found on this site. The data is for viewing purposes only. Data is deemed reliable, but is not guaranteed accurate by the MLS or NTREIS.
Listing information last updated on November 26th, 2024 at 6:15am CST.